Onne Port Complex
Sea PortModerate
ECTN / CTN / BSC Requirement
Check RequiredThe Electronic Cargo Tracking Note (ECTN) is a mandatory document for shipments to many African ports. Requirements vary by country - verify before shipping.
Learn more about ECTN requirementsMajor oil and gas logistics port in the Niger Delta. Free trade zone with tax incentives.
300,000 TEUs
Capacity
150
Annual TEUs
5-7 days
Avg. Dwell Time
24/7
Operating Hours
Location
Port Harcourt, Nigeria
Timezone
WAT (UTC+1)
Port Facilities
Oil & Gas Terminal
Count: 1
FTZ
Capacity: 930 hectares
Shipping Lines
MSC
Europe
Main Trade Routes
Oil routesEuropeAsia
Last updated: 2025-01-01
