Lusaka Dry Port
Dry PortModerate
ECTN / CTN / BSC Requirement
Check RequiredThe Electronic Cargo Tracking Note (ECTN) is a mandatory document for shipments to many African ports. Requirements vary by country - verify before shipping.
Learn more about ECTN requirementsZambia's main dry port processing copper exports and general cargo from multiple corridor routes.
100,000 TEUs
Capacity
60
Annual TEUs
3-5 days
Avg. Dwell Time
24/7
Operating Hours
Location
Lusaka, Zambia
Timezone
CAT (UTC+2)
Port Facilities
Container yard
Count: 1
Bonded warehouse
Count: 2
Shipping Lines
Main Trade Routes
Dar corridorBeira CorridorDurban CorridorWalvis Bay
Last updated: 2025-01-01
