Gloseg

Lusaka Dry Port

ZM flagLusaka, Zambia
Dry PortModerate

ECTN / CTN / BSC Requirement

Check Required

The Electronic Cargo Tracking Note (ECTN) is a mandatory document for shipments to many African ports. Requirements vary by country - verify before shipping.

Learn more about ECTN requirements

Zambia's main dry port processing copper exports and general cargo from multiple corridor routes.

100,000 TEUs

Capacity

60

Annual TEUs

3-5 days

Avg. Dwell Time

24/7

Operating Hours

Location

Lusaka, Zambia

Timezone

CAT (UTC+2)

Port Facilities

Container yard

Count: 1

Bonded warehouse

Count: 2

Shipping Lines

Main Trade Routes

Dar corridorBeira CorridorDurban CorridorWalvis Bay

Last updated: 2025-01-01

Export Tools17+