The Electronic Cargo Tracking Note (ECTN) is a mandatory document for shipments to many African ports. Requirements vary by country - verify before shipping.
Learn more about ECTN requirementsAngola's second port and terminus of the Benguela Railway connecting to DRC and Zambia's copper belt. Strategic corridor port.
200,000 TEUs
Capacity
120
Annual TEUs
5-7 days
Avg. Dwell Time
24/7
Operating Hours
Location
Lobito, Angola
Timezone
WAT (UTC+1)
Container Terminal
Count: 1
Bulk Terminal
Count: 1
MSC
Last updated: 2025-01-01