Port of Libreville (Owendo)
Sea PortLow Congestion
ECTN / CTN / BSC Requirement
Check RequiredThe Electronic Cargo Tracking Note (ECTN) is a mandatory document for shipments to many African ports. Requirements vary by country - verify before shipping.
Learn more about ECTN requirementsGabon's main port at Owendo. Major manganese, timber, and oil export point.
200,000 TEUs
Capacity
120
Annual TEUs
4-6 days
Avg. Dwell Time
24/7
Operating Hours
Location
Libreville, Gabon
Timezone
WAT (UTC+1)
Port Facilities
Container Terminal
Count: 1
Timber Terminal
Count: 1
Shipping Lines
CMA CGM
Europe
Main Trade Routes
EuropeAsiaAmericas
Last updated: 2025-01-01
