Gloseg

Lekki Deep Sea Port

NG flagLagos, Nigeria
Sea PortLow Congestion

ECTN / CTN / BSC Requirement

Check Required

The Electronic Cargo Tracking Note (ECTN) is a mandatory document for shipments to many African ports. Requirements vary by country - verify before shipping.

Learn more about ECTN requirements

Nigeria's newest and most modern deep-sea port, opened in 2023. Designed to handle the largest vessels and reduce congestion at Apapa.

1.5 million TEUs (expandable to 2.7M)

Capacity

500

Annual TEUs

3-5 days

Avg. Dwell Time

24/7

Operating Hours

Location

Lagos, Nigeria

Timezone

WAT (UTC+1)

Port Facilities

Container Terminal

Count: 1

Draft

Capacity: 16.5m

Berth Length

Capacity: 680m

Shipping Lines

CMA CGM

EuropeAsia

MSC

Global

Main Trade Routes

EuropeAsiaAmericas

Last updated: 2025-01-01

Export Tools17+