Gloseg

Chirundu One Stop Border Post

ZM flagChirundu, Zambia
Land BorderLow Congestion

ECTN / CTN / BSC Requirement

Check Required

The Electronic Cargo Tracking Note (ECTN) is a mandatory document for shipments to many African ports. Requirements vary by country - verify before shipping.

Learn more about ECTN requirements

Africa's first One Stop Border Post between Zambia and Zimbabwe. A model for regional integration.

500+ trucks/day

Capacity

2-4 hours

Avg. Dwell Time

24/7

Operating Hours

Location

Chirundu, Zambia

Timezone

CAT (UTC+2)

Port Facilities

Commercial lanes

Count: 4

Truck parking

Capacity: 200 trucks

Joint processing area

Count: 1

Shipping Lines

Main Trade Routes

Zambia-Zimbabwe corridorCopper BeltNorth-South corridor

Last updated: 2025-01-01

Export Tools17+