Gloseg

Port of Berbera

SO flagBerbera, Somalia
Sea PortLow Congestion

ECTN / CTN / BSC Requirement

Check Required

The Electronic Cargo Tracking Note (ECTN) is a mandatory document for shipments to many African ports. Requirements vary by country - verify before shipping.

Learn more about ECTN requirements

Key port in Somaliland managed by DP World. Rapidly modernizing as an alternative Horn of Africa gateway.

500,000 TEUs

Capacity

100

Annual TEUs

3-5 days

Avg. Dwell Time

24/7

Operating Hours

Location

Berbera, Somalia

Timezone

EAT (UTC+3)

Port Facilities

Container Terminal

Count: 1

Economic Zone

Capacity: 12 sq km

Shipping Lines

DP World

Global

Main Trade Routes

Middle EastAsiaEthiopia corridor

Last updated: 2025-01-01

Export Tools17+